SPARC House Meets Net-Zero Using All-Electric HVAC

Advertisement
billboard - default

SPARC House Meets Net-Zero Using All-Electric HVAC

The University of Colorado Boulder's Solar Decathlon SPARC House meets energy goals using an all-electric heating and air-conditioning system.


By
Mitsubishi Electric
June 21, 2021
SPARC House Meets Net-Zero Using All-Electric HVAC
Photo: Casey A. Cass, University of Colorado

Over the years, the University of Colorado Boulder (CU Boulder) has made a name for themselves in the biennial U.S. Department of Energy Solar Decathlon Build Challenge including two first-place finishes in their first two competitions. After a multi-year hiatus, CU Boulder returned to the competition this year determined to once again bring home the winand they did just that. The team’s modular home, built and operated on the pillars of Sustainability, Performance, Attainability, Resilience and Community; the SPARC House, was recently announced the overall winner of the 2020 Solar Decathlon Build Challenge!

The Build Challenge tasks collegiate teams across the globe to build livable, affordable, solar-powered homes that respond to real-world issues. The CU Boulder team chose to address the housing attainability crisis and construction challenges often faced by mountain townsa topical choice given the team’s building location in Fraser, Colorado, 1,200-person town in the foothills of the Rocky Mountains. The team aimed to showcase the attainability and benefits of high-performance home design by employing modular construction methods, renewable energy generation and durable building materials. 

Reaching Net Zero

The SPARC House opted for a mix of electric and solar power. For their mechanical systems, CU Boulder selected Mitsubishi Electric ductless mini-split heat pump systems along with a Mitsubishi Electric PAC-US44CN-1 thermostat interface and emergency heat connections. A RenewAire Energy Recovery Ventilator (ERV) rounded out the mix to give the SPARC House exceptional performance and personalized comfort year-round. 

The heat pumps used to condition the home include two 6,000 BTU/H and one 9,000 BTU/H wall-mounted indoor units, giving the future homeowners the flexibility to individually control airflow and temperature setpoint in three unique comfort zones. These units offer the highest seasonal energy efficiency ratios (SEER) and best minimum capacities for this low-load home during moderate weather. The heat pump systems also feature Hyper-Heating INVERTER® (H2i®) technology, allowing them to deliver 100 percent of rated heating capacity even when it dips to 5° F outside. 

Additional high-performing building materials and systems were used to supplement the mechanical system and further improve the home’s energy usage, including a 6.5 kW photovoltaic array and super-insulating glass. These thoughtfully selected materials mean that upon its completion in April 2021, the SPARC House was not only move-in ready but achieved net-zero-energy status. 

High-Performance Building as a Solution

Mountain towns face unique construction hurdles but making resilient and high-quality construction commonplace in these areas could be a key to overcoming them.

Not only do builders typically work within shortened building seasons due to high altitudes, long winters and unpredictable climates, the seasonal nature of mountain living also puts supply and demand on an ever-teetering seesaw. Mountain towns, especially ski-resort towns, tend to be further off the beaten path than some other rural communities.

Fraser, for example, sits only about 30 miles due west of Boulder, but getting there by car takes a winding, two-hour drive along mountain roads. Its location makes access to building materials, as well as builders themselves less reliable and more costly. The same can be said for calling upon contractors and maintenance technicians if there’s a problem.

Using modular construction methods alleviates much of that concern. Modular homes are built in “modules” at an offsite location, ensuring all systems are in place before final assembly onsite. This essentially eliminates the obstacle of getting materials and team members to a remote job site. Modular construction also mitigates the chance of weather-related interruptions and scheduling delays.

Join us in congratulating the 2020 CU Boulder Solar Decathlon team on their impressive efforts. This year’s competition drew 72 teams from 12 countries, all of whom shared a common goal of using and showcasing the benefits and potential of renewable energy. We’re proud to have been involved!

Read the full case study at: https://mehvac-blog.com/solar-decathlon-sparc-house

Advertisement
leaderboard2 - default
Advertisement
boombox1 -
Advertisement
native1 - default
halfpage2 -

More in Category

Delaware-based Schell Brothers, our 2023 Builder of the Year, brings a refreshing approach to delivering homes and measuring success with an overriding mission of happiness

NAHB Chairman's Message: In a challenging business environment for home builders, and with higher housing costs for families, the National Association of Home Builders is working to help home builders better meet the nation's housing needs

Sure there are challenges, but overall, Pro Builder's annual Housing Forecast Survey finds home builders are optimistic about the coming year

Advertisement
native2 - default
Advertisement
halfpage1 -

Create an account

By creating an account, you agree to Pro Builder's terms of service and privacy policy.


Daily Feed Newsletter

Get Pro Builder in your inbox

Each day, Pro Builder's editors assemble the latest breaking industry news, hottest trends, and most relevant research, delivered to your inbox.

Save the stories you care about

Lorem ipsum dolor sit amet lorem ipsum dolor sit amet lorem ipsum dolor sit amet.

The bookmark icon allows you to save any story to your account to read it later
Tap it once to save, and tap it again to unsave

It looks like you’re using an ad-blocker!

Pro Builder is an advertisting supported site and we noticed you have ad-blocking enabled in your browser. There are two ways you can keep reading:

Disable your ad-blocker
Disable now
Subscribe to Pro Builder
Subscribe
Already a member? Sign in
Become a Member

Subscribe to Pro Builder for unlimited access

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.