The development of more stringent building codes, coupled with the growth of high-performance building programs and Home Energy Rating Systems (HERS) standards, has driven increased scrutiny on the insulation systems that comprise a building's thermal barrier.

A key factor of insulation system performance is the installation. Model building codes now include a table of insulation installation criteria—used as an inspection checklist  by building officials.

In addition, the HERS industry has developed uniform guidelines for consistently grading the installation quality of building insulation. HERS Raters follow these guidelines to assign a grade of I, II, or III, with Grade I representing the highest quality. High-performance building programs, such as the ENERGY STAR® Home and DOE’s Zero Energy Ready Home require Grade I to achieve program certification.

With this emphasis on achieving a Grade I insulation installation, it is helpful to familiarize yourself with the following key considerations captured in the HERS guidelines:

·      Cavity fill and compression:  To achieve a Grade I rating, each cavity should be uniformly filled side-to-side and top-to-bottom. Wall assemblies also require the insulation fills cavities front-to-back, flush with the interior face of framing members. With floor and ceiling assemblies, the insulation must fill all cavities side-to-side and end-to-end.

·      No gaps or voids:  Grade I installations should have no “substantial” gaps or voids in the insulation, around or behind obstructions such as blocking, bridging and electric boxes. The insulation should be split, installed and tightly fitted around wiring and other services in the cavity. It is not considered a Grade I installation if the exterior sheathing is visible from the building interior through gaps in the cavity insulation material.

·      Alignment and enclosure: The insulation acting as the thermal barrier surrounding the conditioned living space should be in continual alignment with the air barrier. For wall assemblies, the cavity insulation should be enclosed on all six sides and be in substantial contact with the sheathing on at least one side (interior or exterior) of the cavity. In floor and ceiling assemblies, the insulation should be in full contact with the subfloor or ceiling material it is intended to insulate. The insulation in rim or band joists should be in substantial contact with the joist. However, the interior sheathing or enclosure material requirement is optional as the insulation does not need to be enclosed to achieve Grade I.

It is also important that all gaps, cracks, and openings at the intersection of building assemblies (ceilings, walls, and floors) and all penetrations through the framing and cracks in the framing cavities should be air sealed before the insulation is installed.

By focusing on the above key considerations, installers ensure that their jobs will pass building code inspection and receive a Grade I from HERS inspectors. This eliminates time-consuming and costly call-backs while enhancing their professional reputation with builders. More information is available at Owens Corning’s dedicated YouTube channel for a series of easy-to-follow instructional step-by-step online videos.  In addition, the Owens Corning field installation guide, Achieving Grade I with Fiberglass Batts, can be found at http://www2.owenscorning.com/literature/items.asp?categoryID=6&tradeshow=.

Advertisement
leaderboard2 - default
Written By

Dwight Shuler has worked for Owens Corning for over 35 years, proving technical support on the application and performance of thermal and acoustic insulation products for use in residential and commercial construction

Advertisement
boombox1 -
Advertisement
native1 - default
halfpage2 -

More in Category

Delaware-based Schell Brothers, our 2023 Builder of the Year, brings a refreshing approach to delivering homes and measuring success with an overriding mission of happiness

NAHB Chairman's Message: In a challenging business environment for home builders, and with higher housing costs for families, the National Association of Home Builders is working to help home builders better meet the nation's housing needs

Sure there are challenges, but overall, Pro Builder's annual Housing Forecast Survey finds home builders are optimistic about the coming year

Advertisement
native2 - default
Advertisement
halfpage1 -

Create an account

By creating an account, you agree to Pro Builder's terms of service and privacy policy.


Daily Feed Newsletter

Get Pro Builder in your inbox

Each day, Pro Builder's editors assemble the latest breaking industry news, hottest trends, and most relevant research, delivered to your inbox.

Save the stories you care about

Lorem ipsum dolor sit amet lorem ipsum dolor sit amet lorem ipsum dolor sit amet.

The bookmark icon allows you to save any story to your account to read it later
Tap it once to save, and tap it again to unsave

It looks like you’re using an ad-blocker!

Pro Builder is an advertisting supported site and we noticed you have ad-blocking enabled in your browser. There are two ways you can keep reading:

Disable your ad-blocker
Disable now
Subscribe to Pro Builder
Subscribe
Already a member? Sign in
Become a Member

Subscribe to Pro Builder for unlimited access

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.