flexiblefullpage - default
Currently Reading

Reduce Lumber Waste: 3 Effective Strategies for Home Builders

Advertisement
billboard - default
Quality Matters

Reduce Lumber Waste: 3 Effective Strategies for Home Builders

Dumpsters overflowing with lumber are merely a symptom. To really reduce lumber waste on jobsites, you need to address your systems


By Andrew Shipp October 2, 2022
Reduce lumber waste to save on framing costs and for a clean jobsite like this one with no lumber scraps in the dumpster
This framed house has no scrap, excess lumber, or panels lying around, indicating an accurate lumber take-off and efficient use of materials. | Photo: courtesy IBACOS
This article first appeared in the September/October 2022 issue of Pro Builder.

To reduce lumber waste, you have to go well beyond mere scraps. While a dumpster full of “scrap” lumber is the most visible example of waste, its impact is far greater if you consider the money spent on excess lumber ultimately not needed for construction—especially given the volatility of materials costs today.

Excess wood is less visible, so it’s often overlooked. But making it a priority will save money, time, and effort while reducing hauls to the landfill. The secret is to be mindful of how you frame certain details, how you order lumber, and how that lumber shows up on site. Here’s how.

Easy Advanced Framing Details to Reduce Lumber Use and Reduce Lumber Waste

We’ve covered optimum value engineering (OVE, aka advanced framing) in this column before, but the techniques always bear repeating as an effective way to reduce lumber use and reduce lumber waste, among other benefits.

Simply, OVE places rafters, joists, and 2-by-6 studs 24 inches on center and vertically aligns framing members to create direct load paths from roof ridges to footings, eliminating the need for double plates and reducing the number of load-bearing window and door headers. All told, using OVE can save about $1,000 in lumber costs for a 2,400-square-foot house, and can help builders complete it in less time, saving additional costs.


RELATED


Even so, few builders fully embrace this approach and still use 2-by-4s at 16 inches on center. But the beauty of OVE is you can adopt certain aspects of it and still benefit. For instance, I see more of our builder clients using three-stud “California” corners to reduce lumber in that area of the frame.

Builders average a 15% waste factor on framing jobs.

A good next step would be insulated headers, which replace a layer of lumber with rigid foam insulation (which also reduces thermal bridging through the header), and reduces the number of jack studs and cripples around the window opening (see illustration, below). It goes without saying that the structural designer needs to approve the change, but since OVE is a well-documented and proven method, that’s not usually a problem.

Advanced framing window header
Illustration: courtesy Home Innovation Research Labs
Advanced framing window header examples that reduce lumber waste
Advanced framing window header examples. | Photos: courtesy IBACOS

Take-Off Tweaks to Save on Lumber Costs

I’ve seen plenty of framing lumber that wasn’t properly optimized arrive at the jobsite—a big reason why builders average a 15% lumber waste factor on their framing jobs.

Say, for example, that the roof of a small porch will need 10 2-by-6 rafters, each 7 feet long. If you order 8-footers and cut 1 foot off each one, you’ll end up with 10 feet of 1-foot scraps. But if you order five 14-footers and cut them in half, there is zero lumber waste.

Lumber waste on a construction jobsite
This framed house has loose boards, panels, and other lumber materials strewn on the ground, likely wasted and also a safety hazard. | Photo: courtesy IBACOS

Optimizing lumber lengths for an entire home will require some effort by the estimator, but most production companies build a handful of designs multiple times, which results in economies of scale whereby the rewards will be multiplied—as will the costs of continuing to ignore the inefficiency of wasted lumber.

Site Adjustments for Optimizing Lumber Quantities

For the estimators to properly optimize lumber and reduce lumber waste, they need feedback from the jobsite.

In many cases, I’ve seen take-offs include 10 more sheets of OSB than the job requires. While some of that OSB may ultimately get returned to the supplier, much of it just clutters the site, ends up damaged and in the dumpster, or “disappears” in the back of a pickup truck. Instead, the site supervisor should confirm the required number of OSB sheets with the framers and then align with the estimator for the take-off. That extra bit of communication will result in a significant return.

None of these steps is difficult, and everyone wins in the end. Real cost savings, less clutter and cleanup, and fewer materials returns are just a few of the benefits. You may even find it motivates you to find more ways to save.  


Andrew Shipp drives quality and performance in home building as a building performance specialist on the PERFORM Builder Solutions team at IBACOS.

 

Advertisement
leaderboard2 - default

Related Stories

Quality Matters

5 Ways to Silence Squeaky Floors

Take these tips to heart to deliver quiet floors and satisfied homeowners

Quality Matters

Tips for Placing HVAC Ducts in Conditioned Space

See how putting HVAC ducts inside conditioned space in a home benefits both the builder and the homeowner

Construction

Ladder Safety Tips for Every Jobsite

Like any construction tool, proper and safe ladder and pump jack use requires dedicated training and constant respect  

Advertisement
boombox1 -
Advertisement
native1 - default
halfpage2 -

More in Category

Delaware-based Schell Brothers, our 2023 Builder of the Year, brings a refreshing approach to delivering homes and measuring success with an overriding mission of happiness

NAHB Chairman's Message: In a challenging business environment for home builders, and with higher housing costs for families, the National Association of Home Builders is working to help home builders better meet the nation's housing needs

Sure there are challenges, but overall, Pro Builder's annual Housing Forecast Survey finds home builders are optimistic about the coming year

Advertisement
native2 - default
Advertisement
halfpage1 -

Create an account

By creating an account, you agree to Pro Builder's terms of service and privacy policy.


Daily Feed Newsletter

Get Pro Builder in your inbox

Each day, Pro Builder's editors assemble the latest breaking industry news, hottest trends, and most relevant research, delivered to your inbox.

Save the stories you care about

Lorem ipsum dolor sit amet lorem ipsum dolor sit amet lorem ipsum dolor sit amet.

The bookmark icon allows you to save any story to your account to read it later
Tap it once to save, and tap it again to unsave

It looks like you’re using an ad-blocker!

Pro Builder is an advertisting supported site and we noticed you have ad-blocking enabled in your browser. There are two ways you can keep reading:

Disable your ad-blocker
Disable now
Subscribe to Pro Builder
Subscribe
Already a member? Sign in
Become a Member

Subscribe to Pro Builder for unlimited access

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.