Currently Reading

Sill Flashing With a Water-Resistive Barrier

Advertisement
Quality Matters

Sill Flashing With a Water-Resistive Barrier

Proper window flashing is a multistep process, but it could all be for naught if you don’t correctly detail the sill


By Richard Baker February 7, 2017
housewrap sill detail for moisture management
This article first appeared in the February 2017 issue of Pro Builder.

Residential windows and their installation have evolved over time. Gone are the counterweights for operable sashes and the cleverly crafted divided lites with single-pane glass … and the time and skills required to create them. 

Today’s windows utilize modern materials and sophisticated manufacturing techniques that eliminate several steps of an old-school installation. But just because every component of a pre-hung unit is integrated doesn’t mean it’s any easier to install. In fact, proper pre-hung window installation is highly prescriptive and deceptively complex, and failure is not always immediately obvious. 

Careful Detailing to Eliminate Air and Water Leaks

Protecting against air and water leakage requires careful detailing. Case after case of reported window failures, specifically regarding water intrusion resulting in everything from indoor air quality issues to structural problems, suggest that the sequence of modern window installation isn’t as easy as it seems. Fortunately, there are ample illustrated references of proven tactics that ensure a quality job—namely inside each shrink-wrapped window and from building science wonks like us. 

But instead of rehashing every step of a window installation here, let’s focus on the sill. Why? Because proper sill flashing will protect the framing and drain any water that breaches the rest of the window assembly, such as cracks in vinyl window welds or improperly applied jamb and head flashing. Simply, the sill is your last line of defense against big problems.

You basically have two options: A preformed sill pan or flashing tape. A preformed pan should include all the necessary elements, such as vertical legs at the jambs, a back dam, and maybe even slope to the exterior. Flashing tape, meanwhile, requires the installation of a continuous piece of flexible, self-adhesive flashing membrane that wraps the entire sill, including the front and back edges and 6 inches up the sides. 

And, once the window is installed, you need to create a back dam with a continuous bead of sealant along the interior connection of the window unit along the sill and up each jamb to block any incidental water that may intrude into the assembly. 

Sill Flashing Best Practices Checklist

If anything, remember this: Proper sill flashing needs an end dam to ensure any water that does reach the sill flashing is forced to drain to the outside. Another crucial rule: Make sure the bottom nailing flange of the window unit is NOT sealed, so that any trapped water can drain to the outside. 

Use the illustration and follow this best-practices checklist to deliver a quality window-sill flashing assembly with an integrated water-resistive barrier (WRB).

1.    Cut the WRB: Cut diagonals from the center of the rough opening to the bottom corners and extend the cuts 3 inches horizontally from each corner.

2.    Secure the pan: Integrate a preformed pan with the WRB or cut a continuous length of flexible self-adhesive flashing tape that is wide enough to cover the sill framing and extend 6 inches up each side jamb. Start at one jamb and carefully expose the adhesive side as you go to eliminate voids and wrinkles.

3.    Install the window: Follow the window manufacturer’s instructions for a proper WRB-integrated assembly.

4.    Create a back dam: Once the window is installed, apply a continuous bead of ASTM C920 Class 25 sealant along the window unit’s interior connection to the sill and 3 inches up each jamb. 

Richard Baker is program manager of the Builder Solutions team at IBACOS

 

Attachment

Related Stories

National Housing Quality Award

2021 NHQA Winners: 4 Home Building Companies Striving for Better

The annual National Housing Quality Awards recognize four home builders for their commitment to continuous operational improvement

Best Practices

The 2020 Roundup of The Weekly

We will be back to our regularly scheduled programming next year! Thanks to all of our readers and viewers. Happy New Year!

Best Practices

How to Manage Basement Moisture

From the attic to the basement, every area of the home has become a living space rather than just the main levels, as once intended. Basements,…

Advertisement
Advertisement

More in Category




Advertisement
Advertisement

Create an account

By creating an account, you agree to Pro Builder's terms of service and privacy policy.


Daily Feed Newsletter

Get Pro Builder in your inbox

Each day, Pro Builder's editors assemble the latest breaking industry news, hottest trends, and most relevant research, delivered to your inbox.

Save the stories you care about

Lorem ipsum dolor sit amet lorem ipsum dolor sit amet lorem ipsum dolor sit amet.

The bookmark icon allows you to save any story to your account to read it later
Tap it once to save, and tap it again to unsave

It looks like you’re using an ad-blocker!

Pro Builder is an advertisting supported site and we noticed you have ad-blocking enabled in your browser. There are two ways you can keep reading:

Disable your ad-blocker
Disable now
Subscribe to Pro Builder
Subscribe
Already a member? Sign in
Become a Member

Subscribe to Pro Builder for unlimited access

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.